2022 PAVING AND OVERLAY SCHEDULE

CHIPSEAL AND OVERLAY PLAN FOR 2022

N. KATY 3.5 MILE
BEHELER .90 MILE
MEIXNER 2.18 MILE
SHEPPERD 1.02 MILE
TIMBER CREEK .62 MILE
S CZECH HALL 1.2 MILE
MECHELL 2.05 MILE
W CRABB 1.00 MILE ( 2311 TO BERGER)
BERGER 1.00 MILE (W CRABB TO SNIDER)
FAJKUS 1.26 MILE
WIGGINS 1.52 MILE
S FORK WIGGINS 1.41 MILE
LINCOLN CITY 2.41 MILE
MESQUITE TREE .71 MILE
OAK KNOLL 1.21 MILE
MAZANEC 2.60 MILE
ROGERS HILL 2.3 MILE (N OF 1858)
JERRY MASHEK 1.67 MILE
CRAWSHAW LANE .67 MILE

2ND COAT OF SEAL

W.M. CLARK .33 MILE
E. CRABB .08 MILE
FAJKUS 1.26 MILE
OLD DALLAS .40 MILE
HERITAGE RIDGE .21 MILE
MARABLE FALLS COURT .12 MILE

RECLAIMED ROADWAY TO BE GROUND BACK TO GRAVEL AND RE-PAVED
CHUDEJ .50 MILE
HEJL LANE .60 MILE
S CZECH HALL (NORTH OF BRIDGE) .20
OLD RAILOAD .30 MILE

NEWLY PAVE ROADWAY 
E. W.A. NEEL .46 MILE
TRLICA