Snider Rd. - Drainage Repairs

Another quality repair and installation by the Precinct 3 Road and Bridge team.

Equipment Operator David Dees mans the excavator, and is assisted by the team to replace a 60" x 46' tin horn on Snider Road.  (7/20)
IMG_3073
IMG_3072
IMG_3076